Industrial Ring-Road Project with Three-Way Bridge

Apologies if this is already posted elsewhere! This is a multiple image jigsaw webpage, so save the whole page if you wish to keep the map.
http://www.alpi-sea.com/irr_map.htm
http://www.alpi-sea.com/construction_projects.htm
http://www.alpi-sea.com/irr_front.htm

Last edited by GWR; 06-03-05 at 09:36 PM..
Reply With Quote
  #17  
Old 06-03-05, 09:41 PM
GWR GWR is offline
Banned
 
Join Date: Jan 2005
Posts: 0
GWR is on a distinguished road
Map-Link

http://www.angkor.com/2bangkok/2bang...75&postcount=1
Reply With Quote
  #18  
Old 07-03-05, 01:19 PM
Wisarut Wisarut is offline
Moderator
User rank - Tram conductor
 
Join Date: Aug 2003
Posts: 5,074
Wisarut is an unknown quantity at this point
Khun GWR Said:
Quote:
It appears from the picture currently on the frontpage that they are also building some sort of 'cut' through the neck of the meander next to the bridge. It would appear that a lot of the excavation has already been done and that some sort of lock or sluice system has also been built at the nearest end. It also looks as though the local road (under the three-way bridge) has already been given its own bridge over this 'shortcut'. Does anyone know if this is a shortcut for barge & ferry traffic (doubt it's big enough for ships, as the 'penstocks'[engineers please ignore dodgy 'lay' talk] aren't high or wide enough), a flood control measure, a tidal control measure or all three?
That's the expanded Klong Lad Pho (Pho Shortcut Canal) .. This one is for flood control & and saline water control as well as small boats, long tail boats, Chao Phraya Express + barges transportation ... NO Ocean Ships ALLOWED to use this canal due to canal width.
Reply With Quote
  #19  
Old 08-03-05, 11:22 AM
Wisarut Wisarut is offline
Moderator
User rank - Tram conductor
 
Join Date: Aug 2003
Posts: 5,074
Wisarut is an unknown quantity at this point
Talking

I just got the latest news abotu this bridge -> It is 43% Done ... ready to be opened on Decembr 5, 2005
Reply With Quote
  #20  
Old 02-06-05, 03:07 AM
ncr's Avatar
ncr ncr is offline
Registered User
User rank - Tram conductor
 
Join Date: Aug 2003
Location: Huaykhwang
Posts: 1,861
ncr is on a distinguished road
Mega Bridge from Space

As 2B is closely monitoring the ongoing construction of the Industrial Ring Road Bridge, here are once again some QuickBird satellite images, nicely illustrating the overall layout (acquired 10 January 2005):

(scales approximate)

Overview (1:17,000) of Yannawa/Phra Pradaeng, with Rama 9 Bridge at the top left and the entire road connection (under construction) to Rama 3 visible.

1:10,000

Detail (1:5000) of the three-way connection. Note the new canal on the right (the name is Lad Pho Canal, I think, and it is also supposed to serve as a shortcut for the future boat service from Bangkok to Samut Prakan??), and also the old one on the left - approximate alignment of the former 'Phra Pradaeng Tram' Line?

-- tip: compare images to the project map
(also http://www.alpi-sea.com/irr_map.htm and http://www.alpi-sea.com/irr_map1.htm)
__________________
born in Southern Lower Saxony - at home in the City of Angels

Last edited by ncr; 06-06-05 at 12:12 AM..
Reply With Quote
  #21  
Old 05-06-05, 11:55 PM
ncr's Avatar
ncr ncr is offline
Registered User
User rank - Tram conductor
 
Join Date: Aug 2003
Location: Huaykhwang
Posts: 1,861
ncr is on a distinguished road
And as an added bonus, Bangkok's "floating forest" can be seen here (west of Rama IX Bridge). Scale approx. 1:3000.

(See http://2bangkok.com/news05d.shtml#floating for the story. The bridge is depicted in the first photo, looking east.)
__________________
born in Southern Lower Saxony - at home in the City of Angels
Reply With Quote
Sponsors

  #22  
Old 07-06-05, 02:10 PM
Yappofloyd Yappofloyd is offline
Registered User
User rank - Tram conductor
 
Join Date: Jan 2005
Location: Bangkok & Melbourne
Posts: 1,657
Yappofloyd is on a distinguished road
Khun ncr,
Thanks for posting these...never did get an answer as to why all those sawn logs have been left on the river adjacent the park other than to provide children with a place to play and fishermen greater access to the river.
Reply With Quote
  #23  
Old 20-08-05, 07:30 AM
The Enforcer!'s Avatar
The Enforcer! The Enforcer! is offline
Registered User
User rank - Tram conductor
 
Join Date: Jun 2004
Location: Sathorn, Bangkok
Posts: 1,624
The Enforcer! is on a distinguished road
Just a short question. Whne the IRR Bridge iscomplete will they be upgrading the roads to complete the circle through Yannawa, Klongtoey, Phra Khannong, Bangna and Samut Prakarn?

The Rama III junction at Klongtoey is congested now - it will get worse if more vehicles use it!

The Enforcer!
Reply With Quote
  #24  
Old 23-09-05, 10:43 PM
admin's Avatar
admin admin is offline
Administrator
User rank - Subway driver
 
Join Date: Aug 2003
Posts: 428
admin is on a distinguished road
Industrial Ringroad Bridge

(from the September 24, 2005 2B front page) It appears that a cabling crane (?) is being moved into place. Anyone know about this device?
Reply With Quote
  #25  
Old 24-09-05, 11:50 PM
ncr's Avatar
ncr ncr is offline
Registered User
User rank - Tram conductor
 
Join Date: Aug 2003
Location: Huaykhwang
Posts: 1,861
ncr is on a distinguished road
Arrow

But that device doesn't have anything to do with the cables. It's used to install deck segments and apparently called a "derrick crane for cantilever construction" or something similar (I am not a civil engineer): article about Rama VIII Bridge

(Scroll down halfway to these photos: 1 - 2, and read the description next to them.)
__________________
born in Southern Lower Saxony - at home in the City of Angels
Reply With Quote
  #26  
Old 25-09-05, 02:03 PM
jerryfin jerryfin is offline
Registered User
User rank - Skytrain driver
 
Join Date: Feb 2004
Location: Rama 3, Bangkok
Posts: 160
jerryfin is on a distinguished road
Send a message via ICQ to jerryfin
I also think they are for decking erection, but compared to the Rama VIII Bridge derrick, these have much less reach. I say "they" because since I took the photo, it has seperated into two parts. As they don't yet have any winches, I am thinking this may be only a part of the complete derrick. But then again, I am not sure as they have already removed the heavy-lift crane they used to assemble the existing part.
As there are only about 15 cables on each side of the bridge(only 15 anchor points), the decking sections would need to be large.
Reply With Quote
  #27  
Old 03-10-05, 06:48 PM
jerryfin jerryfin is offline
Registered User
User rank - Skytrain driver
 
Join Date: Feb 2004
Location: Rama 3, Bangkok
Posts: 160
jerryfin is on a distinguished road
Send a message via ICQ to jerryfin
One of the blue machines(We will call it Viagra 1 as it is blue and facilitates erection) is creeping toward the threshhold above the river..it moves about 20 metres a day. They erected them some way back from the threshhold, because there was no space on the ground for the heavy lift crane to assemble them anywhere else.
Reply With Quote
  #28  
Old 19-10-05, 03:05 PM
Jazzbass Jazzbass is offline
Registered User
 
Join Date: Oct 2005
Posts: 4
Jazzbass is on a distinguished road
IRR Project Erection Gantries

There are 2 pair of Erection Gantries for each of the Stay Cable Decks, so 8 in total (Prapadaeng, Poochao, Rama 3 & Soopanawa). The First Deck Lift was on 12th October at Prapadaeng. The next scheduled lift is on Poochao side on 25th October.
In response to earlier observations, the Erection Gantries do not use winches for lifting but rather VSL Heavy Lifting (Strand) Jacks.
Reply With Quote
  #29  
Old 19-10-05, 08:51 PM
jerryfin jerryfin is offline
Registered User
User rank - Skytrain driver
 
Join Date: Feb 2004
Location: Rama 3, Bangkok
Posts: 160
jerryfin is on a distinguished road
Send a message via ICQ to jerryfin
Many thanks for the comments and schedule Jazzbass......I am still assuming that the entire decking will be steel and proceed relatively quickly after they locate and secure the first section on each tower. I have now counted again the anchor points and believe there will be 14 cables on each side of each tower, or 28 per tower and 56 per bridge. If that is correct, then the towers for the south crossing are both as high as they need be(contain 28 tubes each) for support and will only be extended for decorative effect.
Reply With Quote
  #30  
Old 25-10-05, 10:49 PM
jerryfin jerryfin is offline
Registered User
User rank - Skytrain driver
 
Join Date: Feb 2004
Location: Rama 3, Bangkok
Posts: 160
jerryfin is on a distinguished road
Send a message via ICQ to jerryfin
Fantastic Jazzbass! Sure enough, they raised the first road section on the most southern tower today.
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +7. The time now is 10:16 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
All trademarks and copyrights on this page are owned by their respective companies. Comments are owned by the Poster. The Rest © 1998-2009