Covering the Construction & Restoring the Road Surface
May, 2001 & August, 2001


(Photo: 2Bangkok.com)
The road leading up to Ah-saw-mah-tah Intersection


(Photo: 2Bangkok.com)

(Photo: 2Bangkok.com)
Workers sweep the dirt off the top of the road-surface plates before the plates are lifted off by crane and stacked in the background.

(Photo: 2Bangkok.com)

(Photo: 2Bangkok.com)
After the plates are removed, dirt is filled in the to level of the future road.

(Photo: 2Bangkok.com)
August, 2001 - The final road surface slabs are being poured. Behind this, road drainage pipes are being laid. At the top of the photo is where the track branches off to go to the depot and the detour for southbound cars on Ratchapeisek Road.

BangkokSubway.com main page

If you like 2Bangkok.com, tell your friends and family to make hotel reservations though our hotel reservation service.